Kausar rolling mill

The 550,000 ton Kawsar rebar rolling mill was built in 1381 on a land of 90,000 square meters in line with the policies of industrial self-sufficiency and economic prosperity of the country, and after the installation and commissioning of the equipment, it was put into operation by local experts in 1383.

Using modern technology and modern equipment, using ingots of 130*130 mm2 and 150*150 mm2 ingots (primary materials), this factory is able to produce 550 thousand tons of light construction steel sections, including rebars, studs, corners and belts. .

In 1375, the contract for the purchase of a rebar rolling line and construction sections was concluded in the form of five contracts of “DANIELI” company in the form of finance. The equipment was manufactured and shipped according to the contract. With the provision of financial resources, the construction of the Kausar factory began in September 2001 and was put into operation in November 2003.

The engineering and design of the line equipment was done by the manufacturer of the devices, DANIELI company, and the engineering and design of the metal frame, cranes, compressed air system equipment, ventilation, lighting, notification and fire extinguishing was done based on the specifications of the DANIELI company and by internal experts.

Construction operations, implementation of 756 in-situ concrete piles, construction and installation of 4,000 tons of metal skeletons for the roof and walls of the halls, 34,200 cubic meters of excavation, 36,590 cubic meters of concreting, 4,330 tons of reinforcement and 82,800 square meters of molding for the construction of equipment foundations, Construction of compressor room, electric substation room and gas station, landscaping and walling around the factory، Construction and installation of stairs and access roads and transverse bridges for aerial cranes, installation and operation of equipment, installation of more than 6,000 tons of production line equipment, water supply unit equipment, room compressor, gas station, 33 KW substation, construction of water, electricity and Gas, installation of 19 cranes, 250 km of high-pressure cabling and precision tools, approximately 24 km of piping are the general things implemented to start this factory.

Main equipment:

WALKING HEARTH preheat furnace with a capacity of 110 tons per hour with natural gas fuel
180 to 250 bar water pressure deoxidizing device
Primary rolling stands of CANTILEVER type
Intermediate rolling stands of the type CARTRIDGE
The final rolling stands of the type CARTRIDGE
Product QUENCHING system
Hot cutting scissors
Cooling bed
Longitudinal bending and cutting equipment
Automatic weighing and packaging equipment